Home > Information & Guides > Proleveling Information > Proleveling System Installation Guide
Proleveling System Installation Guide
Step 1: Choose Your Join Type And Spacing

The Proleveling system is made of 2 elements to eliminate tile lippage; a Levelling Base which is available in linear, half cross and crossed 1-2-3-5mm spaced notches that allow installation of any type of material and a pommel cap which fits all clips.

Step 2: Place Desired Clip Under Prepped Tile And Attach Tile Levelling Base To Cap

Prep tile and substrate as normal and place the desired clip under the laid tile. The Proleveling System has cut outs strategically placed on the base to allow for adhesive to push through the base and reach the tile. Once the clip is placed under the tile attach the cap to the threaded stem and adjust as desired.

Step 3: Once The Tile Adhesive Has Dried

The Proleveling System features breakage points that release through the kicking or tapping of the Pommel Cap in the direction of the joint.

Step 4: Remove Clip From Cap

Once the cap is removed from the tile, attach the clip remover to your drill and remove the stem from the cap to reuse the cap for your next tiling job.



Got a job coming up and want us to calculate what you'll need?
Not a problem, contact us via:

☎ (07) 3216 5800 or sales@metrotilesdirect.com.au